Andy and Jack helping bring in and ready more facade pipes for the Gt/Ped side
Viewed: 471 times.
|
and up into place they all start to go!
Viewed: 363 times.
|
Jack takes charge of assembling the mounting rods to the conduits so they're ready to go in
Viewed: 347 times.
|
it proves quicker to hang the pipes on this side, since we can actually reach the backsides of some of them!
Viewed: 398 times.
|
Jack is setting one of the conduits in place in the toeboard, while Joe is barely visible above waiting to receive its top
Viewed: 322 times.
|
Jack readies the next conduit
Viewed: 315 times.
|
Debbi gets her first looks at the new facades, after having been out of town during last week's progress
Viewed: 324 times.
|
Debbi was only slightly speechless, as she stood in the choir seats with (most of) the new facade towering above
Viewed: 336 times.
|
Debbi and Andy taking in "the architect's vision"
Viewed: 352 times.
|
Tim provides lung-powered puffs of "wind" to check pre-voicing
Viewed: 319 times.
|
the Gt/Ped side is definitely going together quicker than the Sw/Ch side did!
Viewed: 341 times.
|
Paul-Martin Maki visited again late this morning, and played for us for a little while after lunch, despite the chaos
Viewed: 346 times.
|
the long side of Gt/Ped facade pipes are all in place!
Viewed: 331 times.
|
Joe catches the sun from one of the skylights, from the upper Great walkboard
Viewed: 366 times.
|
only a few more pipes to go in!
Viewed: 361 times.
|
and here they are -- the last seven pipes getting ready to go up
Viewed: 338 times.
|
now, there's only ONE more left to go!
Viewed: 361 times.
|
Gt/Ped side, all pipes in place, and Jack is raising conduits
Viewed: 358 times.
|
Andy and Ryan sit back and have a look
Viewed: 331 times.
|
still a few conduits to go on the side of the Gt/Ped, but THERE IT IS!
Viewed: 401 times.
|
by quitting time Monday, no more facade pipes to hang!!!
Viewed: 492 times.
|