late Wednesday afternoon, a few pipes in front of Gt/Ped are in
Viewed: 204 times.
|
Thurs. morning, a few more. until Tim couldn't reach over further from atop the Enclosed Gt, that is.
Viewed: 204 times.
|
Joe on the ladder voicing pipes as they go up on the Sw/Ch side
Viewed: 182 times.
|
Initial voicing adjustments can be done on the floor
Viewed: 172 times.
|
moving the ladder over a little, to hang the next pipe in line
Viewed: 163 times.
|
Tim sighting up a pipe to make sure the mouth is aligned, while Jack holds it steady
Viewed: 169 times.
|
then Joe up above fastens it in place
Viewed: 170 times.
|
by Friday morning, the Sw/Ch side is starting to look like something!
Viewed: 164 times.
|
Joe perched amidst the racking, voicing Pedal Principals
Viewed: 182 times.
|
the top of the paneling is about 8' from the floor, and about another 10' to where Joe is...
Viewed: 205 times.
|
now Tim's up there, squeezed between the rack and the swell box. nobody else would fit... (Ryan is lucky he wasn't around!)
Viewed: 185 times.
|
one more Pedal Principal going up
Viewed: 194 times.
|
Sw/Ch side facade nearing completion late Fri afternoon
Viewed: 186 times.
|
the cylindrical silver pipes, with the slender brown conduits set between and slightly proud of them, create interesting visual effects with different lighting
Viewed: 199 times.
|
Sw/Ch side facade late Friday -- all pipes in place!
Viewed: 209 times.
|
another shot of complete Sw/Ch side
Viewed: 229 times.
|