Installation - 3/3/06 
Joe working on Tubing the Swell Facade
Joe working on Tubing the Swell Facade
Viewed: 291 times.

David gluing tubing into the Swell Action Box.
David gluing tubing into the Swell Action Box.
Viewed: 256 times.

Suane making some notes of things that need to be made back at the shop.
Suane making some notes of things that need to be made back at the shop.
Viewed: 241 times.

Solo Facade
Solo Facade
Viewed: 223 times.

Solo Facade
Solo Facade
Viewed: 227 times.

Solo Facade
Solo Facade
Viewed: 213 times.

Choir Facade
Choir Facade
Viewed: 250 times.

Choir Facade
Choir Facade
Viewed: 265 times.

Choir Facade
Choir Facade
Viewed: 299 times.

Powered by Gallery v1 RSS