Dec 1, 2006 
Console with the Keydesk in place
Console with the Keydesk in place
Viewed: 590 times.

ANother photo of the console with the keydesk
ANother photo of the console with the keydesk
Viewed: 542 times.

Enclosed Great with the slider chest in place
Enclosed Great with the slider chest in place
Viewed: 520 times.

Photo from another angle of the enclosed Great
Photo from another angle of the enclosed Great
Viewed: 505 times.

32' Subbass and 16' Open Woods stacked up ready to be loaded on the Truck on Monday morning
32' Subbass and 16' Open Woods stacked up ready to be loaded on the Truck on Monday morning
Viewed: 540 times.

More pipes and the Static Reservoir ready for loading
More pipes and the Static Reservoir ready for loading
Viewed: 488 times.

Another photo of the 16' OW and 32' Subbass ready for loading.  The truck will leave on Monday afternoon and the pipes should start being installed on Wednesday Dec 6th
Another photo of the 16' OW and 32' Subbass ready for loading. The truck will leave on Monday afternoon and the pipes should start being installed on Wednesday Dec 6th
Viewed: 528 times.

The beginnings of the building frame for the Unenclosed Great which stands directly in front of the Enclosed Great
The beginnings of the building frame for the Unenclosed Great which stands directly in front of the Enclosed Great
Viewed: 624 times.

Powered by Gallery v1 RSS