Subbass Toe Board in process of being wired
Viewed: 629 times.
|
Subbass Chest ready to be put together
Viewed: 436 times.
|
Enclosed Great Slider Chest ready for pallet installation
Viewed: 417 times.
|
Enclosed Great Slider Chest with some of the bass pallets in place
Viewed: 424 times.
|
The Enclosed Great Slider Chest with pallets in place ready for the Pallet Box
Viewed: 418 times.
|
Enclosed Great Pallet Box in the process of being wired.
Viewed: 411 times.
|
The Enclosed Great Chest with the pallet box in place and all the pull downs attached ready to be put on the building frame.
Viewed: 431 times.
|
Enclosed Great with the slides in place.
Viewed: 435 times.
|
Jorge getting the Enclosed Great Slider Chest in place on the building frame.
Viewed: 456 times.
|
Another shot of the slider chest going into place.
Viewed: 395 times.
|
Tim on the other end of the chest getting it in place.
Viewed: 393 times.
|
The chest in place on the frame. The ladder at the end is the access to the Encolsed Great.
Viewed: 407 times.
|
Tim installing the slider pneumatics and arms for the Enclosed Great chest.
Viewed: 417 times.
|
A close up of the stop action for the Enclosed Great Chest.
Viewed: 443 times.
|
Ken getting the walk board in place for the Unenclosed Great. The exposed slider chest will rest on the level he is working on with the Pedal Unit Chest and the Subbass Chest pictured earlier on the lover level.
Viewed: 419 times.
|
The console with the Pedal Board sitting in place. The Choir Manual is in place for getting the measurements correct for positioning the pedal board to AGO Standards.
Viewed: 411 times.
|
The knee panel and expression pedals in place. This is still part of the positioning of the components to meet the AGO Standards on Console Design.
Viewed: 414 times.
|
The positioning of the Toe Stud Blosters, which still need to be veneered to match the rest of the console.
Viewed: 403 times.
|
The Knee Panel has been finished with the cut-outs of the Toe Spoons, the Toe Stud Blosters have been venered and drilled and the key desk is in place.
Viewed: 437 times.
|
A close up of the bottom of the console.
Viewed: 437 times.
|
A side view showing the brackets that help support the keydesk.
Viewed: 428 times.
|
The Great "chamber" - the front frame holds the Pedal Unit Chest and the upper part of the Subbass on the lower level with the Unenclosed Great Pallet Box and the Upper Part of the Pedal Trombone Chest on the upper level. The rear frame is the Enclosed Great.
Viewed: 406 times.
|
A view of the shop balcony showing the side of the Great frames with the reservoirs and winding in place. Between the two frames is the chest for the 16' Octave of the Pedal Trombone.
Viewed: 401 times.
|
Another side view showing the Pedal Unit Chest and Subbass Chest on the lower level with the Pedal Trombone upper chest and the pallet box for the slider chest in place on the upper level.
Viewed: 396 times.
|
A view of the two Great frames with the Enclosed Great slider chest in place on the rear frame. Behind the walkboard in the Enclosed Great will be the Tuba Chest which is not in place in this photo.
Viewed: 425 times.
|
Another view of the Great
Viewed: 400 times.
|
A more frontal view of the Great showing the winding going up to the Unenclosed Slider Chest pallet box on the left side and the winding for the Pedal Trombone Chest on the right side. Each of the wind lines has an "open" section that will have a rubber cloth sleeve in the final installation.
Viewed: 449 times.
|
View of the other side of the Great
Viewed: 415 times.
|
|
The bottom of the frames with the reservoirs in place. The large Great reservoir is sitting on the wooden wind trunk that will be connected to the wind line coming up through the floor from the blower and static reservoir in the basement.
Viewed: 418 times.
|
Christian outside lacquering the Pedal Unit Chest toeboard.
Viewed: 642 times.
|