Ken beginning to put the Choir Box walls in place
Viewed: 564 times.
|
Jorge cutting apart the low C of the 32' Subbass AGAIN! this time to do some more mitering so that it will fit in the space where it goes. Unfortunately we had some bad information about the height of the area where these pipes fit and it was mitered to that height. But when Jorge and Duane tried to install it, it hit the ceiling.
Viewed: 459 times.
|
Tim assembling the swell shades blades frames.
Viewed: 436 times.
|
Another photo of Tim working on the shade blades.
Viewed: 444 times.
|
Joe installing the sound traps around the Enclosed Great stop action.
Viewed: 433 times.
|
Jorge placing the rear Swell pallet box on the building frame above the Choit.
Viewed: 418 times.
|
The Choir Box with the two Swell pallet boxes in place so they can be winded.
Viewed: 426 times.
|
Jorge planing down the cut in the low C Subbass to fit it to the rest of the pipe after it has been mitered.
Viewed: 444 times.
|
David boring holes in the rear Swell walkboard. The Double Trumpet bottom octave will fit up through these holes from the chest below.
Viewed: 478 times.
|
Tim continuing work on the Swell Shades.
Viewed: 443 times.
|
The outside of the Choir box with the winding in place to the two Swell Pallet boxes
Viewed: 484 times.
|
The bottom of the Choir/Swell tower with the reservoirs in place and the Choir all winded