Open Wood Restoration 
The bottom 7 pipes of the Open Wood
The bottom 7 pipes of the Open Wood
Viewed: 278 times.

Jorge running one of the pipes through the planer
Jorge running one of the pipes through the planer
Viewed: 232 times.

Some of the pipes needed to be pressure washed to clean the inside of them.  Here are several pipes out in the parking lot drying out after pressure washing
Some of the pipes needed to be pressure washed to clean the inside of them. Here are several pipes out in the parking lot drying out after pressure washing
Viewed: 250 times.

Many of the pipes have needed to be reglued - here is one of them all clamped up after being glued
Many of the pipes have needed to be reglued - here is one of them all clamped up after being glued
Viewed: 233 times.

Another pipe clamped up after being glued
Another pipe clamped up after being glued
Viewed: 223 times.

And a third pipe clamped up.  I think we used just about every clamp in the shop on this pipe!
And a third pipe clamped up. I think we used just about every clamp in the shop on this pipe!
Viewed: 231 times.

Jorge and David gluing up a pipe
Jorge and David gluing up a pipe
Viewed: 227 times.

Another photo of Jorge and David gluing up a pipe
Another photo of Jorge and David gluing up a pipe
Viewed: 226 times.

Bottom octave of the Aeolian Open Wood
Bottom octave of the Aeolian Open Wood
Viewed: 243 times.

The Aeolian Open Wood laid out prior to any work being done on them
The Aeolian Open Wood laid out prior to any work being done on them

Viewed: 260 times.

Low C of the Open Wood clamped up after regluing the pipe
Low C of the Open Wood clamped up after regluing the pipe
Viewed: 234 times.

Another photo of Low C clamped up - you can see the split that was reglued
Another photo of Low C clamped up - you can see the split that was reglued
Viewed: 247 times.

Jorge glue-sizing the inside of the Low C pipe
Jorge glue-sizing the inside of the Low C pipe
Viewed: 273 times.

David putting the first sealer coat of lacquer on the Low C pipe
David putting the first sealer coat of lacquer on the Low C pipe
Viewed: 279 times.

Jorge removing deep dents and scratches on the Low D pipe
Jorge removing deep dents and scratches on the Low D pipe
Viewed: 263 times.

David stripping the old finish off the back of Low C#
David stripping the old finish off the back of Low C#
Viewed: 265 times.

Low C of the Open Wood after it has been sealed with lacquer.
Low C of the Open Wood after it has been sealed with lacquer.
Viewed: 356 times.

Powered by Gallery v1 RSS