The bottom 7 pipes of the Open Wood
Viewed: 425 times.
|
Jorge running one of the pipes through the planer
Viewed: 330 times.
|
Some of the pipes needed to be pressure washed to clean the inside of them. Here are several pipes out in the parking lot drying out after pressure washing
Viewed: 364 times.
|
Many of the pipes have needed to be reglued - here is one of them all clamped up after being glued
Viewed: 317 times.
|
Another pipe clamped up after being glued
Viewed: 315 times.
|
And a third pipe clamped up. I think we used just about every clamp in the shop on this pipe!
Viewed: 327 times.
|
Jorge and David gluing up a pipe
Viewed: 335 times.
|
Another photo of Jorge and David gluing up a pipe
Viewed: 329 times.
|
Bottom octave of the Aeolian Open Wood
Viewed: 338 times.
|
The Aeolian Open Wood laid out prior to any work being done on them
Viewed: 359 times.
|
Low C of the Open Wood clamped up after regluing the pipe
Viewed: 359 times.
|
Another photo of Low C clamped up - you can see the split that was reglued
Viewed: 340 times.
|
Jorge glue-sizing the inside of the Low C pipe
Viewed: 379 times.
|
David putting the first sealer coat of lacquer on the Low C pipe
Viewed: 369 times.
|
Jorge removing deep dents and scratches on the Low D pipe
Viewed: 389 times.
|
David stripping the old finish off the back of Low C#
Viewed: 360 times.
|
Low C of the Open Wood after it has been sealed with lacquer.
Viewed: 504 times.
|