The bottom 7 pipes of the Open Wood
Viewed: 278 times.
|
Jorge running one of the pipes through the planer
Viewed: 232 times.
|
Some of the pipes needed to be pressure washed to clean the inside of them. Here are several pipes out in the parking lot drying out after pressure washing
Viewed: 250 times.
|
Many of the pipes have needed to be reglued - here is one of them all clamped up after being glued
Viewed: 233 times.
|
Another pipe clamped up after being glued
Viewed: 223 times.
|
And a third pipe clamped up. I think we used just about every clamp in the shop on this pipe!
Viewed: 231 times.
|
Jorge and David gluing up a pipe
Viewed: 227 times.
|
Another photo of Jorge and David gluing up a pipe
Viewed: 226 times.
|
Bottom octave of the Aeolian Open Wood
Viewed: 243 times.
|
The Aeolian Open Wood laid out prior to any work being done on them
Viewed: 260 times.
|
Low C of the Open Wood clamped up after regluing the pipe
Viewed: 234 times.
|
Another photo of Low C clamped up - you can see the split that was reglued
Viewed: 247 times.
|
Jorge glue-sizing the inside of the Low C pipe
Viewed: 273 times.
|
David putting the first sealer coat of lacquer on the Low C pipe
Viewed: 279 times.
|
Jorge removing deep dents and scratches on the Low D pipe
Viewed: 263 times.
|
David stripping the old finish off the back of Low C#
Viewed: 265 times.
|
Low C of the Open Wood after it has been sealed with lacquer.
Viewed: 356 times.
|