7/11/07 Tim's snapshots -- "casework" (?) and the first FACADE PIPES! 
first portion of casework framing being installed by Quigley Custom Pipe Organ Components personnel, while Joe works on the console
first portion of casework framing being installed by Quigley Custom Pipe Organ Components personnel, while Joe works on the console
Viewed: 491 times.

Joe adjusting Swell key contacts
Joe adjusting Swell key contacts
Viewed: 382 times.

Larry, Jeremy, and Duane (from Quigley) assembling Choir/Swell side casework structure
Larry, Jeremy, and Duane (from Quigley) assembling Choir/Swell side casework structure
Viewed: 392 times.

Great/Pedal side case framing now in place
Great/Pedal side case framing now in place
Viewed: 371 times.

temporary plywood being installed, pending final approval of color/finish of the permanent mahogany panelwork yet to arrive
temporary plywood being installed, pending final approval of color/finish of the permanent mahogany panelwork yet to arrive
Viewed: 396 times.

facade pipe racking being installed on Sw/Ch side
facade pipe racking being installed on Sw/Ch side
Viewed: 387 times.

Jeremy and Duane installing racking around the Unenclosed Great division
Jeremy and Duane installing racking around the Unenclosed Great division
Viewed: 364 times.

Gt/Ped side framing and racking near completion, with wrapped facade pipes in the foreground waiting to go up
Gt/Ped side framing and racking near completion, with wrapped facade pipes in the foreground waiting to go up
Viewed: 371 times.

the first facade pipe (CCC of the 16' Geigen Principal) on its way into place
the first facade pipe (CCC of the 16' Geigen Principal) on its way into place
Viewed: 398 times.

HORRAY!    It FITS!!
HORRAY! It FITS!!
Viewed: 398 times.

first 3 facade pipes now in place, being unwrapped
first 3 facade pipes now in place, being unwrapped
Viewed: 389 times.

they're looking nice up there without all that foam wrapping!
they're looking nice up there without all that foam wrapping!
Viewed: 375 times.

Jack and Joe starting to unwrap the 'conduits' which will stand between the facade pipes
Jack and Joe starting to unwrap the 'conduits' which will stand between the facade pipes
Viewed: 382 times.

the second pipe (16' Geigen DDD#) going into the Swell/Choir side facade
the second pipe (16' Geigen DDD#) going into the Swell/Choir side facade
Viewed: 375 times.

the bottom 6 pipes of the 16' Geigen Principal in place - the largest (heaviest!) of the entire facade
the bottom 6 pipes of the 16' Geigen Principal in place - the largest (heaviest!) of the entire facade
Viewed: 382 times.

having fun with the temporary plywood paneling, which sorta does add a
having fun with the temporary plywood paneling, which sorta does add a "NYC construction zone" feel to the installation, for the moment...
Viewed: 408 times.

Joe Nichols in midair, adjusting the voicing of the newly playing pipes
Joe Nichols in midair, adjusting the voicing of the newly playing pipes
Viewed: 376 times.

(top-bottom) Joe, Tim, Andy, and Jack lifting the next pipe into the Swell/Choir facade
(top-bottom) Joe, Tim, Andy, and Jack lifting the next pipe into the Swell/Choir facade
Viewed: 392 times.

positioning the pipe
positioning the pipe
Viewed: 423 times.

Joe fastening the pipe hooks down while Tim and Jack hold everything in place
Joe fastening the pipe hooks down while Tim and Jack hold everything in place
Viewed: 524 times.