first portion of casework framing being installed by Quigley Custom Pipe Organ Components personnel, while Joe works on the console
Viewed: 391 times.
|
Joe adjusting Swell key contacts
Viewed: 309 times.
|
Larry, Jeremy, and Duane (from Quigley) assembling Choir/Swell side casework structure
Viewed: 319 times.
|
Great/Pedal side case framing now in place
Viewed: 307 times.
|
temporary plywood being installed, pending final approval of color/finish of the permanent mahogany panelwork yet to arrive
Viewed: 323 times.
|
facade pipe racking being installed on Sw/Ch side
Viewed: 315 times.
|
Jeremy and Duane installing racking around the Unenclosed Great division
Viewed: 286 times.
|
Gt/Ped side framing and racking near completion, with wrapped facade pipes in the foreground waiting to go up
Viewed: 305 times.
|
the first facade pipe (CCC of the 16' Geigen Principal) on its way into place
Viewed: 317 times.
|
HORRAY! It FITS!!
Viewed: 332 times.
|
first 3 facade pipes now in place, being unwrapped
Viewed: 322 times.
|
they're looking nice up there without all that foam wrapping!
Viewed: 294 times.
|
Jack and Joe starting to unwrap the 'conduits' which will stand between the facade pipes
Viewed: 303 times.
|
the second pipe (16' Geigen DDD#) going into the Swell/Choir side facade
Viewed: 309 times.
|
the bottom 6 pipes of the 16' Geigen Principal in place - the largest (heaviest!) of the entire facade
Viewed: 308 times.
|
having fun with the temporary plywood paneling, which sorta does add a "NYC construction zone" feel to the installation, for the moment...
Viewed: 333 times.
|
Joe Nichols in midair, adjusting the voicing of the newly playing pipes
Viewed: 300 times.
|
(top-bottom) Joe, Tim, Andy, and Jack lifting the next pipe into the Swell/Choir facade
Viewed: 312 times.
|
positioning the pipe
Viewed: 331 times.
|
Joe fastening the pipe hooks down while Tim and Jack hold everything in place
Viewed: 420 times.
|